Do I automatically need a service upgrade for solar?expand_more
No. The answer depends on existing equipment, proposed loads and interconnection design. Require a load and equipment assessment rather than an assumption.
Who issues permits in Talent?expand_more
The city publishes building and electrical application resources. Confirm the current path for the exact property and scope before work.
How should solar production be estimated?expand_more
Use the property's electric history, roof geometry, measured shade, equipment assumptions and modeled system losses, all documented in the proposal.
Should I reroof before solar?expand_more
If roof remaining life is materially shorter than the planned array life, coordinating reroofing first may avoid later removal and reinstallation.
What should a battery proposal specify?expand_more
Usable capacity, critical circuits, expected duration under stated loads, operating modes, location, warranty and outage behavior.
How do I verify an electrical contractor?expand_more
Use Oregon's CCB and BCD license searches and match the exact legal entities and license numbers to the proposal.
Can equipment be energized immediately after installation?expand_more
Not necessarily. Required inspections and utility permission to operate should be complete before generation is energized.
What belongs in solar closeout?expand_more
Approved drawings, final statuses, serial numbers, warranties, shutdown instructions, monitoring access and labels for disconnects and backed-up circuits.